Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 04/27/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 04/22/2009 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALL DNSTREAM DIRECTIONAL CLEANOUT PER PLAN. 2. PROVIDE CORRECT TRANSITION BETWEEN PVC AND ABS (GLUE NOT LISTED FOR INSIDE BUILDING) 3. PROVIDE UNIT MOBILE # TO VERIFY PROPER TRAP |
|
| 04/14/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) SUITE 107 ADD SUITE NUMBER TO PERMIT 2) DWV WITH TEST OK 3) GT NOT YET INSTALLED 4) CORRECT VENT CONNECTION AT WB. TIE IN VENT TO EXISTING AND RECALL FOR INSPECTION 5) PROVIDE MINIMUM 1" WATER SUPPLY PER NOTE #1 |