Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2009 | PLUMBING - FINAL | Approved | ||
| 06/09/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. WHERE A VENT CONNECTS TO A HORIZONTAL DRAIN IT SHALL HAVE ITS INVERT TAKEN OFF ABOVE THE DRAINAGE CENTER LINE DOWNSTREAM OF THE TRAP BEING SERVED. EACH VENT SHALL RISE VERTICALLY TO A POINT NOT LESS THAN 6" ABOVE THE OVERFLOW OF THE FIXTURE BEING SERVED, BEFORE OFFSETTING HORIZONTALLY (UNLESS THERE IS A STRUCTURAL CONDITION) VENT FITTINGS BELOW THE FLOOD RIM SHALL BE DRAINAGE TYPE. |
|
| 06/05/2009 | PLUMBING - FINAL | Not ready for Inspection | 1. 3-COMP SINK WASTE NOT INSTALLED PER PLAN 2. NO VACUUM RELIEF VALVE ON WATER HEATER 3. SUPPORT I.W. PIPING 4. TRIM NOT INSTALLED PER PLAN |
|
| 06/04/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |