Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2009 | ROOF NAILING | Approved | IVRS - Inspection :* 1) NEED ALL HANGERS PUT ON PLAN USE SIMPSON CAT. TO REF. WHAT TYPE NAIL REQUIRED FOR EACH HANGER INSPECTOR WILL CHECK FOR CORRECT NAILS USED 2) NOTE: FOR FUTURE FRAMING INSPECTION 6 X 6 POSTS AND GLU LAM. HOW DO THEY CONNECT IF THEY DO TO TRUSSES, NEED DETAIL 3) ALSO ALL GIRDER TRUSSES CALL FOR NAIL PATTERN DOESN'T LOOK LIKE IT WAS FOLLOWED WHEN TRUSSES WERE MADE 4) NEED EXPLANATION FOR 1/2" DIAMETER BOLT PLACEMENT ON GIRDERS 5) TRP AND LOCATE T-21 TRUSS |