Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2009 | ENGINEERING - FINAL | Approved | All items complete, approved | |
| 11/23/2009 | ENGINEERING - FINAL | Denied | Complete the following prior to C of O 1) Complete asphalt patch of castings in parking lot. 2) The parking stalls on the south side of the middle parkiing area are only 17ft, stripe per plan. 3) Install Van sign under HC parking sign 4) Finish placing DG in ROW along Ajo Wy. 5) Remove all construction debris and equipment. 6) Submit as-built drawings for grading permit #T09BU00061 |