Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2009 | PLUMBING - INTERMEDIATE | Approved | ||
| 04/03/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 03/30/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. ALL CHANGES TO THE PLAN TO BE ACCOMPANIED WITH REDLINE CHANGES MADE TO THE PLAN. NOT INSTALLED PER PLAN, NO REDLINES ON SITE. 2. HORIZONTAL VENTING BELOW THE FLOOD RIM OF THE FIXTURE LIMITED TO STRUCTURAL CONDITIONS ONLY HORIZ. VENTING BELOW THE FLOOD RIM (WHERE ALLOWED) TO HAVE 2% GRADE 3. HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP. TRAP ARM TO BE INSTALLED AT 2% GRADE AND SUPPORTED 4. ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES, THEN NO MORE THAN FOUR FEET BETWEEN HANGERS. 5. REQUIRE TYPE "K" COPPER BELOW GRADE 6. RENEW INSULATION REQUIREMENTS FOR PIPING |