Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2009 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 06/24/2009 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : There is no access to the site.| 920* |
|
| 04/28/2009 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 03/27/2009 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) THIS CLEARANCE IS FOR TEMP POWER TO DO CONSTRUCTION. NO CIRCUITS TO BE ENERGIZED IN BLDG WITHOUT ELECTRICAL INSPECTORS APPROVAL OR TEP WILL BE CONTACTED TO TURN OFF POWER AND THEN A BOND WILL NEED TO BE POSTED TO GET POWER BACK ON |
|
| 03/26/2009 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. SERVICE CONDUCTORS TO BE LISTED AND MARKED SUNLIGHT RESISTANT TO BE MARKED EVERY 2' WITH CONSTRUCTION MARKINGS. 2. OK WALLS AND CEILINGS ENSURE METAL BOXES GET GROUNDED. EXISTING 2 WIRE UNGROUNDED SYSTEM TO BE GFI PROTECTED OR 2 PRONG RECEPTS INSTALLED. |