Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/11/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* DWV W/TEST THRU ROOF OK OK TO BACKFILL |
|
| 03/10/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. NO TEST ON SYSTEM 2. CALL FOR BOTH ROUGH AND INTERMEDIATE INSPECTIONS 3. PROVIDE LADDER FOR ABOVE CEILING INSP. PROVIDE SLOPE, SUPPORT AND PROTECT TRAP ARMS PASSING THRU METAL. 4. WRAP ABS PASSING THRU CONCRETE 5. RELOCATE T&P AND INSTALL BACKING AT MS FAUCET 6. LAV CARRIER SPECIFIED 7. SAFETY PLATES MISSING 8. ISOLATE AND PROTECT COPPER 9. OK TO INSULATE HW PIPING 10. CLOSET STUB IS TOO LOW (DRAIN) |