Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/14/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 22ND STREET PEDESTRIAN BRIDGE DECK (ONLY) REINFORCEMENT STEEL-OK TO POUR-SPECIAL INSPECTED BY WESTERN TECH |
|
07/01/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) COUNTRY CLUB BRIDGE DECK POUR OK, REBAR OK . 2) WEST TO SPECIAL INSPECT |
|
06/10/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* STILL NEED LETTER W/STAMP FROM ENGINEER RE: 3/4" AB ALL FOUR BRIDGE ABUTTMENTS WING WALLS AND TOP PAD REINFORCE STEEL & ANCHOR BOLTS - OK WESTERN TECH. SPECIAL INSPECTED AND APPROVED |
|
06/02/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ALL FOUR BRIDGE ABUTMENTS (TWO AT EACH LOCATION) REINFORCEMENT STEEL - OK - SHEET #S-1 - DETAIL #1 CALLS FOR 1" X 1'8" GALV. ANCHOR BOLTS, 3/4" X 1'8" GALV. BOLTS WERE USED - AWAITING LETTER FROM ARCH. APPROVING CONTRACTOR TO POUR @ OWN RISK - WESTERN TECH. HAS SAME NOTE ON THEIR REPORT |
|
05/20/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 2 @ TYPICAL ABATEMENT FOOTINGS AS PER DETAIL; PAGE S1-1 OK TO POUR FOOTINGS |