Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2009 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 06/05/2009 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* PRE-INSPECTION WALK THRU 1. LIQUID TIGHT TO BE LISTED - NEC 350.6 2. PV SOURCE CIRCUITS TO BE ONLY CIRCUITS IN RACEWAYS NEC 690.4(B) 3. POST TO BE INSTALLED FOR SHADE STRUCTURE WILL BE INSTALLED IN FRONT OF DISCONNECT FOR PV FIELD NEED PROPER WORKING CLEARANCES IN FRONT OF DISCONNECTS PER NEC 110.26 |
|
| 06/04/2009 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* |