Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/17/2009 |
ENGINEERING - FINAL |
|
Approved |
CONTRACTOR COMPLETED THE PLACEMENT OF ASPHALT IN THE DRIVEWAY AREA OFF OF 22ND STREET. |
| 07/16/2009 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
SITE NOT READY FOR INSPECTION. REINSPECTION NECESSARY FOR FRIDAY 7/17/09. |
| 07/10/2009 |
ENGINEERING - FINAL |
|
Correction Required |
WALK SITE WITH SUPER. ASPHALT PATCH STILL NEEDS TO BE DONE WHERE NEW TRANSFORMER WAS INSTALLED. JOHN WILL CALL OUT INSPECTION NEXT WEEK WHEN WORK HAS BEEN COMPLETED. |