Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/26/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PER P-4 INSTALLATION INSTRUCTIONS ON PLAN. PROVIDE A NON-SLAM CHECK VALVE FOR BY PASS |
|
| 08/25/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE 90 DEGREE DOWN ON 1ST LEVEL T & P DRAIN TERMINATION 2) SECURE AND SUPPORT EXPANSION TANK AT BOOSTER PUMP 3) WHERE IS THE PRESSURE TANK AND SUCTION. CHECK VALVE AND PRESSURE RELIEF ON BOOSTER SYSTEM PER PLAN ? 4) PROVIDE LISTING FOR R.O. SYSTEM FOR DIRECT SANITARY DRAIN CONNECTION WITH NO AIR GAP FAUCET 5) COMPLETE INSULATION ON 2ND AND 3RD LEVEL HOT AND HOT RETURN PIPING 6) INSTALL WATER HEATER PIPING PER PLAN (ADDITIONAL CHECK VALVE) |
|
| 08/19/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SHOWER PAN OK |