Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T09CM00228
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2010 | BUILDING - FINAL | Approved | IVRS - Inspection :* 1) RECEIVED LETTER FROM ELECTRICAL CONTRACTOR FOR RECORDS 2) HOUSE APPEARS TO BE SAFE AND MAY NOT BE TO CODE |
|
| 06/14/2010 | BUILDING - FINAL | Denied | 1 - LETTER FROM LICENSED ELECTRICIAN TO SAY THAT EXISTING ELECTRIC IS TO CODE - IF POSSIBLE 2 - RAISE REAR BEDROOM SMOKE ALARM WITHIN 12" OF CEILING, LOW BATTER IN MASTER BEDROOM ALARM 3 - A REFEE WILL BE ASSESSED |
|
| 11/09/2009 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1) COMPLY WITH #4 & 5 FROM INSPECTION DONE ON 10/08/09 |
|
| 10/08/2009 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) EXTERIOR OSB SITING ON GROUND, NOT ALLOWED 2) SUBMIT AS BUILT CROSS SECTION OF STRUCTURE, SO AS TO ADVISE ON REPAIRS, SHOW WALLS, FLOORS AND CEILING 3) 1-SWITCHED LIGHT AND 1-OUTLET REQUIRED IN EACH ROOM, MINIMUM 4) SMOKE ALARMS REQUIRED IN EACH BEDROOM AND HALLWAY 5) HAVE LICENSED ELECTRICIAN CHECK ALL ELECTRICAL WORK AND CERTIFY OF CURRENT CODE COMPLIANCE 6) STAIR SHALL HAVE MINIMUM THREAD OF 10" AND MAX RISE OF 7 3/4" WITH 3/8" TOLERANCE |