Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2010 | ENGINEERING - FINAL | Approved | ||
| 08/04/2009 | ENGINEERING - FINAL | Partial Approval | CONTRACTOR NEEDS TO COMPLETE THE FOLLOWING: 1)CLEAN SITE. REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS, INCLUDING FENCING. 2)COMPLETE ALL WATER HARVESTING/LANDSCAPE AREAS, ESPECIALLY THOSE CLOSEST TO THE RIGHT-OF-WAY 3) INSTALL BIKE PARKING IN DESIGNATED AREAS. PARKING RACKS WERE ON SITE BUT WERE NOT SECURED. 4) PROVIDE AS-BUILST FOR CHANGES TO THE H/C PARKING LOCATIONS AT THE FRONT OF BUILDING 2 5) PROVIDE PILOT HOLES NEEDED FOR TRASH ENCLOSURE IN OPEN POSITION 6) COMPLY WITH DSMR RE:SIDEWALK WIDTHS PER ANDY CONNOR 7)PROVIDE ENGINEERING LETTERS CERTIFYING SITE AND BASINS 8) CALL IN FOR REINSPECTION WHEN ITEMS HAVE BEEN COMPLETED. |