Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2009 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 02/04/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALL BONDING SCREW IN DISCONNECT FOR CONDENSING UNIT 2. PLAN CALLS FOR #10's TO BE INSTALLED TO CONDENSING UNIT 3. HAVE 2 POLE 50 ON #12's TO FAN COIL UNIT PLEASE VERIFY PROPER SIZE WITH ENGINEER 4. PLAN CALLS FOR 2 AMP FUSES FOR FAN COIL UNIT 5. WHITE WIRES NOT TO BE INSTALLED IN RACEWAY AS PHASE CONDUCTORS. PHASE CONDUCTORS TO BE IDENTIFIED ALONG ENTIRE LENGTH IN RACEWAY 6. PATCH AROUND SWITCH BOXES NO MORE THAN 1/8" GAP 7. NEED SERVICE RECEPT. FOR CONDENSING UNIT TO BE WITHIN 25' AND GFI PROTECTED |
|
| 02/03/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920* NO ANSWER AT DOOR RECALL INSPECTION |