Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2009 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 03/18/2009 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/23/2009 | BUILDING - FINAL | Not ready for Inspection | 1) WIRES TO NORTH & SOUTH SIDE LIGHTS MUST BE IN CONDUIT 2) SECURE SWITCH BOX TO WALL NEXT TO H20 HEATER AND PUT WIRE IN CONDUIT 3) NEED SOLID GAS PIPE THRU H20 HEATER CAB 4) CHANGE N.W. BED CLOSETS LIGHT FIX TO COVER BULB 5) NEED ACCESS TO MASTER TUB 6) NORTH EAST ROOM NEEDS 2ND EGRESS WINDOW 7) CARPORT ROOM NEEDS PERMIT 8) NO SET BACK ISSUES EXCEPT FOR CARPORT ROOM |