Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/06/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NOTES FROM 2/23/10 DO NOT APPLY TO THIS PROJECT 2) DEMO IN RESTROOM NORTH EAST OK 3) DEMO OF GAS PIPING WEST MECH ROOM OK |
|
| 02/23/2010 | PLUMBING - FINAL | Not ready for Inspection | 1) PROVIDE MINIMUM 3/4' TO ROOF TOP UNIT 2) PROVIDE A PERMIT AND HANG MECHANICAL INSPECTION ON NEW ROOF TOP UNIT 3) A GAS FLEX CANNOT BE USED AS PIPING AND GAS VALVE FOR ROOF TOP UNIT TO BE WITHIN 6' OF UNIT. 4) PROVIDE BONDING OF BUILDING GAS PIPING 5) PROVIDE PPOR COMBUSTION AIR FOR WATER HEATER & MAKE INSORT PROOF ALL PIPE OP INTO STRUCTURE 6) TEMPERATURE & PRESSURE ROZIGE DRAIN TO HANG 90 PERCENT DOWN AT TERMINATION 7) PROVIDE TEST GAUGE IN 1/10 POUND INCREMENTS 8) PROVIDE COLD WATER INLET VALVE FOR NEW WATER HEATER |