Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/04/2011 |
GRADING - FINAL |
|
Approved |
ALL PREVIOUS NOTED ITEMS HAVE BEEN COMPLETED. |
| 09/22/2010 |
GRADING - FINAL |
|
Correction Required |
CREWS HAVE COMPLETED MOST OF THE WORK ON THIS SITE BUT STILL NEED THE FOLLOWING 2 ITEMS: 1) THE HANDICAP SIGNS FOR THE NORTH PARKING SPACES NEED TO BE INSTALLED ONTO POLES PER OUR APPROVED STANDARDS. 2) INSTALL THE TRUNCATED DOMES FOR THE CROSS-WALK IN THIS SAME AREA AS SHOWN ON THE APPROVED PLANS. |
| 09/15/2010 |
GRADING - FINAL |
|
Continued |
PAVING CONTRACTOR WORKING ON THE PLACEMENT OF THE ABC, SHOULD HAVE THE GRADES COMPLETED BY FRIDAY, AND PAVING EITHER FRIDAY OR NEXT WEEK. |
| 08/24/2010 |
GRADING - FINAL |
|
Continued |
CREWS WORKING ON THE BUILDING CONSTRUCTION, NO CONCERNS AT THIS TIME. SITE SUPER WILL BE READY FOR SOME FINAL INSPECTIONS BY THE END OF SEPTEMBER. |