Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 09/29/2010 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR PAVING FRONT SECTION OF PARKING AREA, WILL INSPECT AFTER PAVING COMPLETED. NO STORM WATER CONCERNS AT THIS TIME |
|
| 09/27/2010 | STORMWATER FOLLOW-UP INSP | Continued | SOME SITE WORK COMPLETED, NO CONCERNS. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 09/13/2010 | STORMWATER FOLLOW-UP INSP | Continued | SITE WORK BEING ACCOMPLISHED. CHANGE TO PED ACCESS AT CROSSING NEAR ENTRANCE DUE TO >2% CROSS SLOPE. CONTRACTOR WILL USE SOUTH PED ACCESS AS ADA ACCESS TO ROW. SOME CURBING COMPLETED, PAVING IN TWO WEEKS. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 08/23/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED, AND THE SUROUNDING AREA IS SWEPT ROUTINELY. NO SITE WORK TAKING PLACE AS OF TODAY |
|
| 07/21/2010 | STORMWATER FOLLOW-UP INSP | Continued | 1) SITE IS < 1 ACRE THEREFORE NO SWPPP IS REQUIRED; HOWEVER CONTRACTOR WILL USE EXISTING CURB LINE TO PROTECT A STORM WATER CATCH BASIN LOCATED ALONG THE WEST SIDE OF SITE. 2) CONTRACTOR WILL INSTALL AND USE A STABILIZED CONSTRUCTION ENTRANCE ALONG THE NE CORNER OF THE SITE. 3) ESURE TRACKING OF SOIL FROM SITE IS SWEPT ON A ROUTINE BASIN. 4) CALL FOR INSPECTION FOR ANY QUESTIONS/CONCERNS OR FOR ANY CHANGES FROM THE APPROVED PLANS. |