Inspection Status: Approved
Inspection History: GRADING - TIER REV
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2010 | GRADING - TIER REV | Approved | ||
| 07/30/2010 | GRADING - TIER REV | Continued | AS-BUILT DRAWINGS WILL BE REQUIRED TO BE SUBMIOTTED AND APPROVED PRIOR TO SCHEDULING THE FINAL GRADING INSPECTION. | |
| 07/02/2010 | GRADING - TIER REV | Continued | 1) ELEVATION CHANGES WERE MADE IN PARKING LOT IN ORDER TO STAY IN COMPLIANCE W/ HC PARKING AND ACCESS WAY MINIMUM AND MAXIMUM SLOPES REQUIRED. 2) SWALE WILL BE CONSTRUCTED APPROXIMATELY 30' IN FROM THE NORTH SIDE OF LOT PROPERTY LINE, IN ORDER TO ALLOW STORM WATER TO DRAIN AWAY FROM THE FOUNDATION OF THE ADJACENT BLDG. 3) GROUTED ROCK RIP RAP WILL BE INSTALLED ALONG UP-SIDE OF NEW SIDEWALK AND AT OUTLET OF PARKING AREA SWALE. 4) ALL CHANGES MADE TO THE ORIGINAL APPROVED PLAN WILL BE SHOW ON AN AS-BUILT PLAN AND SUBMITTED TO THE COT FOR ARCHIVING. 5) SWEEP UP TRACKED SOIL OFF OF ADJACENT PUBLIC ROADWAY. |
|
| 06/29/2010 | GRADING - TIER REV | Continued | PLANS HAVE BEEN REVISED TO SHOW NEW SIDEWALK ACCESS FROM THE ROW TO THE BLDG THAT MEETS THE REQUIRED SLOPE. IN ACCORDANCE WITH THE SUPERINTENDENT, THE ENG OF RECORD STATED THAT THERE WAS NO NEED FOR A SCUPPER ALONG THE NW CORNER OF SITE. SURFACE DRAINAGE WILL SHEET FLOW DOWN DRIVEWAY ACCESS POINTS. |