Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 04/20/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | SPOKE W/ REVIEW ENGINEER AND SUPINTENDENT ABOUT ALL PROPOSED CHANGES TO SITE ACCESS. A REVISED SET OF PLANS IS REQUIRED IF SIGNIFICANT CHANGES ARE MADE TO THE ORIGINAL GRADING PLAN-- NO SWPPP FOR THIS SITE | |
| 04/16/2010 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | MET W/ GENERAL CONTRACTOR ON SITE. DUE TO ELEVATION CHANGES FROM THE BLDG (FFE) AND THE ROW ELEVATION, CONTRACTOR IS UNABLE TO PROVIDE PUBLIC ACCESS TO AND AROUND THE BLDG THAT MEETS ADAAG/ AS IT'S SHOWN ON THE APPROVED GRADING PLAN. THE CONTRACTOR STATED THAT THEY WOULD SHOOT PRE CONSTRUCTION ELEVATIONS AND COME UP WITH AN ACCEPTABLE SOLUTION. (BARKER MORRISEY - CRAIG 260-0498) JASON GREEN WAS ENG REVIEWER. |