Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/04/2012 | STORMWATER FOLLOW-UP INSP | Approved | CONSTRUCTION HAS BEEN COMPLETED, PHASE III OF THE MAINT FACILITY. ALL SITE WORK HAS BEEN CONSTRUCTED PER THE APPROVED PLANS. SITE IS 100% STABILIZED. | |
03/11/2011 | STORMWATER FOLLOW-UP INSP | Continued | SITE STILL UNDER CONSTRUCTION. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
01/11/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) INSTALL A CONCRETE/MATERIALS WASH OUT FOR CONSTRUCTION OF BLDG AT SW CORNER OF SITE, AND USE IT. 2) RE-INSTALL SEDIMENT CONTROLS ALONG RET/DET BASIN INLET PROPERLY. 3) NO SIGNIFICANT SITE WORK BEING DONE YET 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP. |
|
12/15/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. NO SITE WORK AT THIS TIME. |
|
12/02/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SITE WORK BEING ACCOMPLISHED YET, CONSTRUCTION BEING DONE ON THE BLDGS ONLY. CONTRACT NEEDS TO ADD STORM WATER CONTROLS TO INLET OF EXISTING RET/DET BASIN |
|
10/22/2010 | STORMWATER FOLLOW-UP INSP | Continued | RAINING TODAY: PERIMETER STORM WATER CONTROLS HAVE BEEN INSTALLED. SWEEP TRACKED SOIL OFF ROADWAYS. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SOME WORK BEING DONE ON BLDG ALONG WEST SIDE OF SITE. STORM DRAINAGE IN SOUTH PARKING LOT DONE DURING PHASE II DOES NOT DRAIN PROPERLY |