Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T09BU01581

Parcel: 10703178A

Inspection Status: Approved

Inspection History: GRADING - FINAL

Date Description Inspector Results Comments
08/05/2011 GRADING - FINAL Approved
07/19/2011 GRADING - FINAL Continued PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE RET/DET BASIN AND SURFACE STORM DRAINAGE WAS CONSTRUCTED PER THE APPROVED PLAN.
06/21/2011 GRADING - FINAL Continued CONTRACTOR IN PROCESS OF PAVING. NEED DRAINAGE CERTIFICATION STATEMENT FROM THE ENG OF RECORD STATING THAT ALL STORM DRAINAGE WAS CONSTRUCTED PER THE APPROVED PLAN.
NEED REVISED PLAN THAT SHOWS ALL CHANGES MADE TO ORIGINAL PLAN.
COMPLETE THE ABOVE ITEMS PRIOR TO FINAL INSPECTION APPROVAL.
04/26/2011 GRADING - FINAL Continued FOLLOW UP INSPECTION, SITE STILL NOT PAVED. ALL SIDEWALKS, CURBING, TRASH ENCLOSURE...HAVE BEEN INSTALLED.
REMOVABLE BOLLARD BEING INSTALLED IN FRONT OF A HC ACCESS RAMP?
ROOF DRAINS NEED TO LINE UP WITH SCUPPERS.
NEED DRAINAGE CERT FROM ENG OF RECORD.