Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T09BU01550
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/25/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
02/03/2010 | STORMWATER FOLLOW-UP INSP | Continued | PICS TAKEN OF HEADWALL AT CULVERT OPENING. HEADWALL HAS BEEN POURED AND COMPLETED. CATCH BASIN TIE-IN IS CONSTRUCTED. SOME LANDSCAPE ISLAND CURBING AND 1 CATCH BASIN LEFT TO BE POURED. CALL FOR RE-INSPECTION. PICS TAKEN OF SCREEN WALL FOOTINGS NO STORM WATER CONCERNS AT THIS TIME |
|
01/20/2010 | STORMWATER FOLLOW-UP INSP | Continued | CULVERT PIPE HAS BEEN PLACED IN TRENCH AND BURRIED, STILL NEED TIE-IN TO EXISTING CATCH BASIN AND TO CONSTRUCT OUTFALL - CONTRACTOR NEEDS TO SWEEP ACTIVE PARKING AREA - NO OTHER STORM WATER CONCERNS AT THIS TIME |
|
01/19/2010 | STORMWATER FOLLOW-UP INSP | Continued | NEW GRADING PERMIT ISSUED TO FINISH REMODEL OF COSTCO UNDER PERMIT #T08BU01961. CONTRACTOR WILL CONSTRUCT NEW PARKING AREA AND STORM DRAINAGE SYSTEM/OUTFALL FOR EXISTING SITE. SITE IS STILL UNDER AN AZPDES PERMIT AND STORM WATER PLAN. CONTRACTOR WAS PREPING TRENCH FOR PLACEMENT OF 6X9 CONCRETE BOX CULVERT DRAINAGE STRUCTURE. TRENCH HAS BEEN GRADED AND WILL BE BEDDED FOR CULVERT. APPROXIMATELY 220' OF CULVERT REMAINS TO BE SET FROM EXISTING CATCH BASIN TO OUTFALL NO STORM WATER CONCERNS AT THIS TIME |