Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T09BU01406
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/04/2012 | STORMWATER INSTALL OF CONTROLS | Approved | ||
08/10/2011 | STORMWATER INSTALL OF CONTROLS | Continued | THE REMAINDER OF THE SILT FENCE HAS BEEN PLACED ALONG THE NORTHSIDE OF THE PROJECT, THE WADDLE ALONG THE WEST SIDE WILL BE PLACED NEXT WEEK ONCE ADDITIONAL SURVEYING HAS BEEN DONE TO LOCATE THE WEST PROPERTY BOUNDARIES. I HAVE ASKED THAT THE CONTRACTOR PLACE A PHYSICAL BEARIER IN THE WAS AREA TO ENSURE THAT THE EQUIPMENT AND OPERATORS STAY OUT IN THE FUTURE. | |
08/09/2011 | STORMWATER INSTALL OF CONTROLS | Continued | CHECKED ON THE SITE TODAY TOO SEE WHAT TYPE OF CONTROLS HAVE BEEN INSTALLED AND IN WHAT LOCATIONS. EPAC IS WORKING ON INSTALLING CONTROLS ALONG THE EAST SIDE OF THE PROPERTY, THEY HAVE COMPLETED INSTALLING APPROXIMATELY 600 LINEAKL FEET OF SILT FENCE, BUT STILL HAVE TO BACKFILL OVER HALF OF IT TOMORROW. |