Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T09BU01406
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/05/2011 | ENGINEERING PRE-CONSTRUCTION | Approved | MET ONSITE WITH JAY AND THE CONTRACTORS REPRESENTATIVES TO DISCUSS WHAT IS THE PLAN FOR THIS SITE. THEY WILL START REMOVING THE VEGITATION FROM THE PERIMETER OF THE SITE ON MONDAY AND THE STORMWATER CONTROLS WILL BE PLACED ON TUESDAY 8/9/11. ALL HAVE BEEN ADVISED TO STAY OUT AND AWAY FROM THE 404 WASH UNTIL OTHERWISE NOTIFIED BY ME OR THROUGH SOMEONE AT 201 N. STONE. I WILL TALK TO LAITH ALSHAMI ON MONDAY IF THERE IS ANY AREAS WHERE THEY MIGHT USE THE WASH TO CROSS FROM ONE SECTION TO THE OTHER. WE WALKED THE SITE AND DISCUSSED THE TYPE OF STORM CONTROLS THAT THEY ARE PLANNING ON USING AT THIS TIME. |