Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/05/2020 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
TEP HAS COMPLETED AND FINISHED THIS SITE WITHOUT THE FINAL INSPECTIONS OR CLOSEOUT DOCUMENTATION |
| 01/19/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
SPOKE WITH PROJECT MANAGER (FRANK 572-7522) AND SITE FORMAN (GILBERT 404-9697) ABOUT INSPECTION CALLED. INSPECTION WAS FOR REBAR LAYOUT FOR FOOTING OF PERIMETER SCREEN WALL. NO CONCERNS AT THIS TIME. PROJECT WILL BE INSPECTED BY DAVE ROBERTS |