Permit: T09BU01312

Parcel: 11519002J


Addresses:

1425 W GRANT RD


Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T09BU01312

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
08/30/2010 GRADING - INTERMEDIATE Approved
08/19/2010 GRADING - INTERMEDIATE Continued INSPECTED THE CONSTRUCTION OF THE HEADWALL FOR RET/DET BASIN OUTLET PIPE ALONG THE SE CORNER OF THE SITE. REBAR AND FORMS BEING SET. FOOTER BEING POURED TODAY. WILL REINSPECT WHEN HEADWALL BEING POURED ON FRIDAY.

QUESTION ON REQUIREMENT/NO REQUIREMENT FOR TACTILE WARNING STRIP ALONG ACCES POINT IN FRONT OF BLDG. WILL ASK FOR CLARIFICATION FROM THE EOR AND THE COT.

NO STORM WATER CONCERNS AT THIS TIME
07/21/2010 GRADING - INTERMEDIATE Continued 1) TOOK PICTURES OF BUBBLER PIPE INSTALLED AT EAST END OF RET/DET BASIN AT REAR OF BLDG.
2) LOOKED AT SLOPE ALONG EAST SIDE OF SITE, ENSURE TOE-DOWN IS INSTALLED WHERE SHOWN ON PLANS. ENSURE GROUTED RIP RAP IS INSTALLED WHERE SHOWN ON PLANS.
3) POST AND CABLE BARRICADE SHOULD BE INSTALLED ALONG NE CORNER OF SITE FROM EXISTING BARRICADE TO NEW CONCRETE CURB TO PREVENT ACCESS ALONG PARKWAY EXCEPT FOR PARKS AND REC DEPT EMPLOYEES.
4) NO STORM WATER CONCERNS AT THIS TIME
07/16/2010 GRADING - INTERMEDIATE Continued 1) Parks and Rec is requiring a post and cable barricade along the PAAL adjacent to the east property line and linear parkway. The post and cable barricades need to be built under the grading plan and can be shown on the "as-built" or revised grading plan prior to final inspection. JG
2) 12" PVC ROOF DRAIN LINE FROM GAS ISLAND CANOPY IN PLACE. ENSURE PIPE IS CLEANED OUT PRIOR TO CONNECTION TO BUBBLER. GROUT PIPE CONNECTION IN PLACE PER PLAN.
3) ENSURE 36" CONCRETE BUBBLER IS CONSTRUCTED PER PLANS W/ LINER, AND MIN OF 48" OF WASHED GRAVEL AT 1 1/2 - 3' SIZE.
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
06/24/2010 GRADING - INTERMEDIATE Continued 1) SOME VERT CURBING HAS BEEN POURED, W/ CURB OPENINGS INSTALLED FOR DRAINAGE.
2) EQUALIZER PIPE HAS BEEN INSTALLED AT THE TWO RET/DET BASINS IN THE REAR OF THE BLDG.
3) NEED TO INSPAECT ROOF DRAIN TIE-IN FROM GAS CANOPY TO RET/DET BASINS PRIOR TO COVER.
4) CONTRACTOR SHOULD ADD SUPPLEMENTAL STORM WATER CONTROLS TO OUTLET/INLET PIE TO THE SANTA CRUZ RIVER ALONG EAST SIDE OF SITE.
05/11/2010 GRADING - INTERMEDIATE Correction Required 1) LEAK IN WATER HOSE, DISCHARGING OFF SITE FROM FIRE HYDRANT. FIX LEAK, REPLACE HOSE, BRING SOIL FROM SITE BACK ON TO SITE, AND RE-ESTABLISH STORM WATER CONTROLS.
2) CONTRACTOR WILL RUN A 12" PVC ROOF DRAIN FROM GAS CANOPY AND TIE INTO A 36" RCP BUBBLER BOX.
3) AN 8" PVC DRAIN LINE WILL RUN OFF THE MAIN BLDG INTO THE BASIN.
4) A 12" PVC EQUALIZER PIPE WILL TIE THE TWO SOUTH BASINS TOGETHER.
5) AN OUTLET STRUCTURE WILL BE CONSTRUCTED FOR THE SE BASIN W/ A HEAD WALL THAT DROPS INTO THE SANTA CRUZ RIVER