Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T09BU01312
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/30/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
07/16/2010 | STORMWATER FOLLOW-UP INSP | Continued | 1) Parks and Rec is requiring a post and cable barricade along the PAAL adjacent to the east property line and linear parkway. The post and cable barricades need to be built under the grading plan and can be shown on the "as-built" or revised grading plan prior to final inspection. JG 2) 12" PVC ROOF DRAIN LINE FROM GAS ISLAND CANOPY IN PLACE. ENSURE PIPE IS CLEANED OUT PRIOR TO CONNECTION TO BUBBLER. GROUT PIPE CONNECTION IN PLACE PER PLAN. 3) ENSURE 36" CONCRETE BUBBLER IS CONSTRUCTED PER PLANS W/ LINER, AND MIN OF 48" OF WASHED GRAVEL AT 1 1/2 - 3' SIZE. 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
06/24/2010 | STORMWATER FOLLOW-UP INSP | Continued | 1) SOME VERT CURBING HAS BEEN POURED, W/ CURB OPENINGS INSTALLED FOR DRAINAGE. 2) EQUALIZER PIPE HAS BEEN INSTALLED AT THE TWO RET/DET BASINS IN THE REAR OF THE BLDG. 3) NEED TO INSPAECT ROOF DRAIN TIE-IN FROM GAS CANOPY TO RET/DET BASINS PRIOR TO COVER. 4) CONTRACTOR SHOULD ADD SUPPLEMENTAL STORM WATER CONTROLS TO OUTLET/INLET PIE TO THE SANTA CRUZ RIVER ALONG EAST SIDE OF SITE. |
|
05/11/2010 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) LEAK IN WATER HOSE, DISCHARGING OFF SITE FROM FIRE HYDRANT. FIX LEAK, REPLACE HOSE, BRING SOIL FROM SITE BACK ON TO SITE, AND RE-ESTABLISH STORM WATER CONTROLS. 2) CONTRACTOR WILL RUN A 12" PVC ROOF DRAIN FROM GAS CANOPY AND TIE INTO A 36" RCP BUBBLER BOX. 3) AN 8" PVC DRAIN LINE WILL RUN OFF THE MAIN BLDG INTO THE BASIN. 4) A 12" PVC EQUALIZER PIPE WILL TIE THE TWO SOUTH BASINS TOGETHER. 5) AN OUTLET STRUCTURE WILL BE CONSTRUCTED FOR THE SE BASIN W/ A HEAD WALL THAT DROPS INTO THE SANTA CRUZ RIVER |
|
04/30/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |