Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | PRE-CON MEETING ACCOMPLISHED. SITE IS 2 ACRES AND HAS A SWPPP. 1) INSTALL PERIMETER STORM WATER CONTROLS PER YOUR APPROVED SWPPP. 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/ENTRANCES. 3) SWEEP UP TRACKING OFF OF GRANT ROAD ROUTINELY. 4) PERFORM PERIODIC STORM WATER MAINT INSPECTIONS PER YOUR PLAN AND DOCUMENT THEM. 5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE AND USE IT. 6) SITE MUST STAY IN COMPLIANCE W/ YOUR SWPPP UNTIL THE SITE IS 100% STABILIZED/NOT IS FILED. |