Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2012 | GRADING - FINAL | Approved | ||
| 10/22/2010 | GRADING - FINAL | Partial Approval | FOR FINAL APPROVAL: STILL NEED ENG OF RECORD STAMPED BASIN/STORM WATER CERTIFICATION STATEMENT AND AS-BUILT PLAN SHOWING CHANGES MADE FROM THE ORIGINAL APPROVED GRADING PLAN. |
|
| 09/29/2010 | GRADING - FINAL | Continued | 1) PROVIDE AN AS-BUILT DRAWING FOR THE COT, DEVELOPMENT SERVICES TO SHOW CHANGES THAT WERE MADE (NEW SIDE WALK, HC ACCESS RAMPS, ROCK RIP RAP ADDED..) AND CHANGES CURRENTLY BEING MADE. 2) PROVIDE A RETENTION BASIN/ DRAINAGE CERTIFICATION STATEMENT FROM THE ENG OF RECORD STATING THAT DRAINAGE WAYS AND BASINS CONSTRUCTED WERE SUBSTANTIALLY COMPLETED PER THE APPROVED GRADING PLAN. 3) COMPLETE ANY REMAINING LANDSCAPE AND/OR FINISHING WORK AND CALL FOR RE-INSPECTION. |