Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2009 | FIRE - ALARM FINAL | Approved | ||
| 08/04/2009 | FIRE - ALARM FINAL | Denied | 1. FACP AND NAC'S need to be on dedicated circuits. 2. Need lock outs on each breaker. 3. On each door to NAC'S and FACP label where the electical panel is located and breaker number. 4. Label each battery when it was installed. |