Permit: T09BU00917

Parcel: 10705126B


Addresses:

801 W MIRACLE MILE

Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Date Description Inspector Results Comments
08/19/2010 GRADING - INTERMEDIATE Approved
06/30/2010 GRADING - INTERMEDIATE Continued MET WITH MANAGEMENT ON SITE, DISCUSSED REVISED PLAN AND CHANGES MADE TO PROJECT. NEED ENG. AND ZONNING APRROVAL ON REVISION.
06/29/2010 GRADING - INTERMEDIATE Continued 1) CHANGES TO SIDEWALKS/ AND SIDEWALK LOCATIONS. REVISE PLANS TO SHOW NEW LOCATIONS.

2) COURTYARD WALKWAYS WERE NOT INSTALLED PER COT STD 200 AS SHOWN ON APPROVED PLANS. REVISE PLANS TO SHOW CHANGES AND WALKWAYS MUST BE A MIN OF 4'.

3) ENSURE RUN SLOPES ON ALL ACCESS WAY AND SIDEWALKS DO NOT EXCEED 5%.

4) SWEEP UP TRACKING OFF PUBLIC ROADWAYS ALONG WEST SIDE.

5) PRIOR TO APPROVAL BY ENGINEERING FOR A C OF O, COMPLETE ALL SITE WORK ASSOCIATED WITH THE BLDG AND PHYSICALLY SEPARATE REMAINING CONSTRUCTION WITH THE PUBLIC.
06/10/2010 GRADING - INTERMEDIATE Continued WALKED SITE W/SUPINTENDENT, NO ADDITIONAL CHANGES FROM REVISED GRADING PLAN. PHASE TWO OF PROJECT IS AT CITY FOR REVIEW, SITES WILL WORK TOGETHER AS FAR AS DRAINAGE AND ACCESS.
SOME CONCERN ABOUT ROOF FROM BLDG SHEET FLOW ONTO PLANTER (12" WIDE) NEXT TO SIDEWALK, W/ NO SCUPPERS IN SIDEWALK LOCATED AT THE SOUTH END OF SITE.

CONTRACTOR PRESERVED TWO EUCALYPTUS TREES ALONG EAST SIDE, OWNER PLANTING ADDITIONAL PLANTS COMPARED TO LANDSCAPE PLAN.

NO STORM WATER CONCERNS AT THIS TIME
04/29/2010 GRADING - INTERMEDIATE Continued 1) CHANGES TO NORTH SIDE PARKING AREA/REMOVAL OF EXTRUDED CURB DUE TO ELEVATION CHANGE. INSTALL WHEEL STOPS INSTEAD/ASPHALT WILL BE FLUSH W/ SIDE WALK.
2) PEDESTRIAN ENTRANCE INTO FRONT DOOR OF MAIN BLDG WILL RAMP DOWN TO ASPHALT AND BE FLUSH, CHANGE TO PLAN TO ALLOW FOR DRAINAGE.
3) CONTRACTOR WILL USE METAL TRUNCATED DOMES.
4) PROVIDE AS-BUILT SHOWING CHANGES MADE TO ORIGINAL PLANS.
5) SWEEP UP TRACKING OFF OF MIRACLE MILE
03/30/2010 GRADING - INTERMEDIATE Continued MULTIPLE BLDGS BEING REFURBISHED ON SITE, SOME DIRT WORK BEING ACCOMPLISHED. NO SITE WORK BEING DONE CURRENTLY. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. CONTRACTORS ON SITE MUST ENSURE THAT THEY DISPOSE OF ANY CONSTRUCTION WASTE PROPERLY.
01/27/2010 GRADING - INTERMEDIATE Continued FOOTER BEING DUG FOR SCREEN WALL ALONG SOUTH SIDE, SPOILS ARE BEING PLACED ON INSIDE EDGE OF TRENCH.
PERIMETER OF SITE MUST BE SWEPT ROUTINELY UNTIL SITE IS HARDSCAPED, PAVED AND/OR STABILIZED
01/20/2010 GRADING - INTERMEDIATE Correction Required LOTS OF DEMO ON SITE
CONTRACTOR CONTINUES TO BURN WASTE ON SITE
GRADING LIMIT FOR CURRENT ACTIVE GRADING PERMIT NOT CLEARLY MARKED.