Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date |
Description |
Inspector |
Results |
Comments |
| 01/08/2010 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
A COMPACTED "V" DITCH HAS BEEN CONSTRUCTED ALONG THE SOUTH PERIMETER TO ACT AS TEMP SEDIMENT CONTROL UNTIL THE PERIMETER WALL IS CONSTRUCTED. CONTRACTOR MUST CONTINUE TO SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS AS NEEDED. CONTRACTOR MUST ADD SUPPLEMENTAL SEDIMENT CONTROLS IF NEEDED THROUGHOUT CONSTRUCTION. |