Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/27/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
|
| 09/17/2009 |
ENGINEERING PRE-CONSTRUCTION |
|
Partial Approval |
MET WITH BOB SENEFF ONSITE TO LOOK OVER THE PLANS AND DISCUSS HIS PLAN FOR THIS SITE. THEY WILL START THE WORK ONSITE NEXT WEEK AND WILL ENSURE THAT THERE IS NO RUNOFF OF ANY WATER OR SOIL ONTO THE ADJACENT PROPERTIES. CURRENTLY THIS SITE IS NOT REQUIRED A S.W.P.P.P. DO TO THE SIZE, BUT HAVE REMINDED BOB THAT THEY STILL NEED TO MAINTAIN ALL OF THEIR POLUTANTS WITHIN THE BOUNDARIES OF THE SITE. ALSO HAVE ADVISED HIM THAT SINCE THEY ARE SEEKING PERMISSION FROM THE CITY TO UTILIZE THE PROPERTY EAST OF THIS SITE FOR THE STOCKPILNG |