Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 10/12/2009 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
PICKED UP THE PRE-CON FORM FOR THE SITE AND WILL PLACE IT INTO THE FILE. CONSTRUCTION IS IN THE DEMOLITION PHASE. |
| 09/28/2009 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
MET WITH CONTRACTOR TO DISCUSS THE S.W.P.P.P. PRE-CON AND WHAT THEIR REQUIREMENTS WILL BE DURING THE CONSTRUCTION PROCESS. WE LOOKED OVER THE PRE-CON FORM AND THEY WILL BE PROVIDING US WITH THE CONTACT INFORMATION FOR THE SITE. THIS FORM WILL BE PICKED UP FROM THE CONTRACTOR IN 2 WEEKS AND PLACED INTO THE FILE FOLDER. |