Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 07/07/2009 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
SPOKE WITH REG LOPEZ REGARDING RESOLUTION TO DRAINAGE SITUATION. SOLUTION PROVIDED IS A DRAINAGE CULVERT TO BE INSTALLED AFTER UTILITY TIE-IN. WILL MEET HIM ON SITE TOMORROW. |
| 06/15/2009 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
REFERED APPLICANT D.T. TO SPEAK WITH LOREN REGARDING POSSIBLE SOLUTIONS TO LOT DRAINAGE. |
| 06/05/2009 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
SPOKE WITH REG LOPEZ (271-0531) REPRESENTATIVE FOR OWNER CHRISITAN SALCIDO. AFTER INVESTIGATING SITE HISTORY (WITH LOREN MAKUS, JIM FEMLING AND DAVE ROBERTS), IT IS DETERMINED THAT DUE TO THE AMOUNT OF FILL ON THE PROPERTY AND SINCE THE SITE WAS ORIGINALLY GRADED WITHOUT PERMITS, THE OWNER WILL HAVE TO REESTABLISH THE DRAINAGE SWALE ON THE NORTH SIDE OF THE PROPERTY, INCLUDING UNCOVERING, CLEARING AND ENSURING THE OPERATION OF THE DRAINAGE PIPE ON THE NORTH SIDE OF THE PROPERTY. |