03/18/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
11/03/2009 | ENGINEERING PRE-CONSTRUCTION | Correction Required | ADVISED THE CONTRACTOR THAT THEY NEED TO HAVE A SWEEPER TRUCK COME OUT TO THE SITE TO ASSIST IN THE CLEANING OF THE ROADWAY, THE LABOR CREW IS NOT WORKING ADEQUATELY. THE PIMA COUNTY DEPARTMENT OF ENVIRONMETAL QUALITY HAS VISITED THE SITE TODAY DUE TO THE FACT THAT EXCESSIVE DUST WAS BLOWING ON-SITE YESTERDAY AFTERNOON. I WAS ALSO ADVISED THAT THE CONTRACTOR HAS HEARD FROM THE TRANSPORTATION DEPARTMENT AS WELL AS A.D.E.Q. ON THE SAME MATTER, BUT DO NOT KNOW IF ANYTHING WAS ADDRESSED PUBLICLY FOR THIS SITE EITHER IN CITATION OR WARNING FASHION. I ADVISED THE CREW THAT I NEEDED TO SEE A MECHANICAL SWEEPER ON-SITE BY TOMORROW TO ASSIST IN THE STREET CLEANING OR A NOTICE OF VIOLATION WOULD BE ISSUED. THEY HAVE AGREED TO HAVE THIS EQUIPMENT ON-SITE BY CLOSE OF BUSINESS DAY ON 11/04/09 AND WILL UTILIZE IT TILL THE AREA IS FULLY CLEAN AND RETURNED BACK TO THE PREVIOUS NATURAL CONDITIONS. THEY HAD BEEN REDUCING THE WATER ON THE STOCKPILE AREA, BUT THIS WILL BE INCREASED DUE TO THE RECENT ISSUANCE OF PAPERWORK FROM THE P.C.D.E.Q.. I ADVISED THEM THAT I WILL CHECK THE SITE AGAIN ON THE 11/4/09 TO VERIFY THAT THEY HAVE INSTALLED THE SILT FENCE S.W.P.P.P. CONTROLS AS SHOWN ON THE APPROVED PLANS, AND THEY ARE USING MECHANICAL SWEEPER. |
|
11/02/2009 | ENGINEERING PRE-CONSTRUCTION | Correction Required | HAUL-OFF CONTINUES MATERIAL IS BEING NOTED ON THE STREET LIGHTLY, HAVE ADVISED THE CONTRACTOR TO ENSURE CLEAN-UP AS NEEDED. THEY WILL TRY TO MAINTAIN THE TRACK OUT OF THE SITE, AND WILL LIGHTEN THE AMOUNT OF WATER THAT THEY ARE APPLYING TO THE STOCKPILE. | |
10/30/2009 | ENGINEERING PRE-CONSTRUCTION | Correction Required | THE CONSTRUCTION S.W.P.P.P. HAS NOT FULLY BEEN INSTALLED AT THIS TIME, THERE HAVE BEEN NO CONCERNS. THE CONTRACTOR HAS STARTED HAUL-OFF OF THE EXCESS MATERIAL FROM THE SITE, MINOR DUST IS BEING GENERATED. THEY WILL HAVE A WATER TRUCK TO WET DOWN THE PILE OF MATERIAL TO HELP ELIMINATE THE CONCERNS, AND WILL ADDRESS THEM AS THEY ARISE. | |
10/27/2009 | ENGINEERING PRE-CONSTRUCTION | Correction Required | THE CONTRACTOR CONTINUES TO WORK ON THE REMOVAL OF THE VEGETATIVE MATERIAL FOR THIS SITE AND SHOULD HAVE IT FINISHED BY THE END OF THE WEEK. S.W.P.P.P. CONTROLS HAVE BEEN PLACE IN AREAS AS NEEDED AT THIS TIME, BUT WILL FULLY BE PLACED EITHER LATER THIS WEEK OR THE FIRST OF NEXT WEEK. I HAVE ASKED THE CONTRACTOR TO CONTACT ME WHEN THE MATERIAL IS FULLY IN PLACE FOR VARIFICATION AND TO NOTE THE TYPE AND PLACEMENT OF CONTROLS ONTO THE FIELD DRAWINGS. MODIFICATIONS TO THE TYPE OF MATERIAL BEING UTILIZED WILL BE NOTED ON THE PLANS AS NEEDED. |