Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/08/2012 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
|
| 05/18/2011 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
NO CONCERNS AT THIS TIME |
| 06/10/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Partial Approval |
CONTACTED THE HOME OWNER AND ADVISED HIM THAT THE PAPERWORK IS IN THE PROCESS ONCE I HAVE ACCESS BACK TO OUR PERMITS PLUS SYSTEM. PARTIAL APPROVAL GRANTED ON 6 8 2010 |
| 06/08/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Partial Approval |
MET WITH THE HOME OWNER TO DISCUSS WHAT HIS INTENTION IS FOR THIS PERMIT. HE IS ANTICIPATING STARTING WORK ON THIS SITE WITHIN THE NEXT NINETY DAYS. I ADVISED HIM THAT WE MAY NOT PERFORM AN INSPECTION IN THE FUTURE IF HE DOES NOT START WORK PRIOR TO THE NEXT EXPIRATION DATE. |
| 06/07/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Not ready for Inspection |
NO CONTACT |
| 12/18/2009 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
MET WITH THE PROPERTY OWNER TO DISCUSS WHAT ARE THE REQUIREMENTS FOR THE STORMWATER DRAINAGE ISSUES THAT CAN BE ANTICIPATED DURING THE UPCOMING CONSTRUCTION. HE WILL BE CONTACTING BE ONE WEEK PRIOR TO STARTING WORK TO ENSURE THAT ALL THE REQUIREMENTS HAVE BEEN ADDRESSED. |