Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | DAN WALKER 661-201-8118 WITH SPG SOLAR INC SPOKE WITH DAN ON SITE. ALL SITE WORK HAS BEEN COMPLETED. AS BUILT FOR CHANGES ON ELECTRICAL PLANS ARE BEING SUBMITTED. |
|
| 05/14/2009 | ENGINEERING PRE-CONSTRUCTION | Correction Required | Contractor needs to call in Pre-con inspection. Spoke to site super in regards to. |