Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 06/29/2011 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
Approved |
| 12/16/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Strom controls OK |
| 10/13/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Controls in place |
| 08/10/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Controls in place where needed. |
| 07/14/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Controls look OK |
| 03/11/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Controls OK |
| 03/04/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Rock added to entrance off of Camino Campestre |
| 02/02/2010 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Clean up construction entrance, maintain inspection logs |
| 01/29/2010 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Check for track out sweep street as needed. |