Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2011 | STORMWATER INSTALL OF CONTROLS | Approved | 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER SWPPP. 2) CONCRETE WASH OUT WILL BE INSTALLED AT A LATER TIME. 3) ENSURE SEDIMENT CONTROLS ARE MAINTAINED AND ARE SELF INSPECTED PER PLAN. 4) SWEEP UP TRACKING AS NEEDED |
|
| 07/07/2011 | STORMWATER INSTALL OF CONTROLS | Violation | CONTRACTOR HAS NOT INSTALLED SEDIMENT CONTROLS PER HIS APPROVED SWPPP. 1) INSTALL STORM WATER SEDIMENT CONTROLS AS SHOWN ON YOUR APPROVED STORM WATER PLAN, TO INCLUDE PERIMETER SILT SOCK, A STABILIZED CONSTRUCTION ENTRANCE AND A CONCRETE WASH OUT. 2) INSTALL CONTROLS BY FRIDAY 7/8/11. NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER UNTIL SEDIEMNT CONTROLS CAN BE INSTALLED PER YOUR STORM WATER PERMIT AND AS STATED IN YOUR APPROVED GRADING PERMIT/PLAN. |
|
| 07/01/2011 | STORMWATER INSTALL OF CONTROLS | Approved | Met with contractor and told him that they need to install storm controls by end of the day. Site work has begun. |