Permit: T09BU00456

Parcel: 13317062G

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
12/17/2009 STORMWATER FOLLOW-UP INSP Approved
11/20/2009 STORMWATER FOLLOW-UP INSP Continued SEDIMENT CONTROLS MUST REMAIN IN PLACE DURING WORK HOURS AND THROUGHOUT CONSTRUCTION UNTIL SITE IS STABILIZED. SITE WORK HAS NOT BEEN COMPLETED
10/28/2009 STORMWATER FOLLOW-UP INSP Continued NO STORM WATER CONCERNS AT THIS TIME - SITE NOT PAVED YET, SOME CURBING IN PLACE
10/07/2009 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.

SURFACE DRAINAGE TO THE WEST THROUGH CURB OPENINGS INTO RIP RAPED CHANNEL, GRADE SPLITS NORTH AND SOUTH. STORM WATER ENDS UP INTO SMALL RET/DET BASINS.
TWO 12" CULVERT PIPES CARRY WATER UNDER ENTRACNCE OFF OF ROAD AND UNDER TRASH ENCLOSURE
07/21/2009 STORMWATER FOLLOW-UP INSP Continued 1) ENSURE STORM WATER INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP.
2) ENSURE TRACKING IS SWEPT ROUTINELY.
3) PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE.
NO OTHER SWPPP CONCERNS AT THIS TIME
06/18/2009 STORMWATER FOLLOW-UP INSP Continued 1) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH-OUT ON SITE WHEN APPLICABLE.
2) ENSURE YOU PERFORM STORMWATER SELF INSPECTIONS PER YOUR PLAN AND DOCUMENT THEM.
3) POST A SIGNED COPY OF YOUR NOI ON SITE.
4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE DURATION OF THE PROJECT.
5) SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ROUTINELY.