Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 11/20/2009 | STORMWATER FOLLOW-UP INSP | Continued | SEDIMENT CONTROLS MUST REMAIN IN PLACE DURING WORK HOURS AND THROUGHOUT CONSTRUCTION UNTIL SITE IS STABILIZED. SITE WORK HAS NOT BEEN COMPLETED | |
| 10/28/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME - SITE NOT PAVED YET, SOME CURBING IN PLACE | |
| 10/07/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SURFACE DRAINAGE TO THE WEST THROUGH CURB OPENINGS INTO RIP RAPED CHANNEL, GRADE SPLITS NORTH AND SOUTH. STORM WATER ENDS UP INTO SMALL RET/DET BASINS. TWO 12" CULVERT PIPES CARRY WATER UNDER ENTRACNCE OFF OF ROAD AND UNDER TRASH ENCLOSURE |
|
| 07/21/2009 | STORMWATER FOLLOW-UP INSP | Continued | 1) ENSURE STORM WATER INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP. 2) ENSURE TRACKING IS SWEPT ROUTINELY. 3) PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE. NO OTHER SWPPP CONCERNS AT THIS TIME |
|
| 06/18/2009 | STORMWATER FOLLOW-UP INSP | Continued | 1) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH-OUT ON SITE WHEN APPLICABLE. 2) ENSURE YOU PERFORM STORMWATER SELF INSPECTIONS PER YOUR PLAN AND DOCUMENT THEM. 3) POST A SIGNED COPY OF YOUR NOI ON SITE. 4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE DURATION OF THE PROJECT. 5) SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ROUTINELY. |