Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2009 | STORMWATER INSTALL OF CONTROLS | Approved | 1) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH-OUT ON SITE WHEN APPLICABLE. 2) ENSURE YOU PERFORM STORMWATER SELF INSPECTIONS PER YOUR PLAN AND DOCUMENT THEM. 3) POST A SIGNED COPY OF YOUR NOI ON SITE. 4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE DURATION OF THE PROJECT. 5) SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ROUTINELY. |