Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T09BU00456

Parcel: 13317062G

Inspection Status: Approved

Inspection History: STORMWATER INSTALL OF CONTROLS

Date Description Inspector Results Comments
06/18/2009 STORMWATER INSTALL OF CONTROLS Approved 1) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH-OUT ON SITE WHEN APPLICABLE.
2) ENSURE YOU PERFORM STORMWATER SELF INSPECTIONS PER YOUR PLAN AND DOCUMENT THEM.
3) POST A SIGNED COPY OF YOUR NOI ON SITE.
4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE DURATION OF THE PROJECT.
5) SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ROUTINELY.