Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T09BU00446
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/09/2010 | GRADING - FINAL | Approved | ASbuilt submitted and approved. | |
02/02/2010 | GRADING - FINAL | Partial Approval | Item #2 complete checking on as-builts | |
01/22/2010 | GRADING - FINAL | Denied | Complete item #2 and submit final asbuilt/site plan for approval | |
01/13/2010 | GRADING - FINAL | Denied | Complete the following prior to final approval; Sht. 6 1) Install water harvest per note 4 or reivse plan. 2) Install curb opening with bollards per note 17 3) Install 4" reflective tape to bollards at curb openings per deatil. 4) Install 3 ft curb openings per note 9 or revise plan. Sht 7 1) Extend scupper to end of sidewalk next to power transformer. 2) Add rip rap at outfall per detail Q/10 3) Install access ramps to rear basins per plan. 4) Install swale and riprap per plan & detail at east edge of project, or get engineering approval. 5) Check elevation at outfall scupper to basin detail AA/12. Revise as-builts as necessary to reflect actual conditions in the field. Remove all construction debris and temp. roll off. |