Permit: T09BU00446

Parcel: 140260370

Inspection Status: Approved

Inspection History: GRADING - FINAL

Permit Number - T09BU00446

Inspection Description - GRADING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
02/09/2010 GRADING - FINAL Approved ASbuilt submitted and approved.
02/02/2010 GRADING - FINAL Partial Approval Item #2 complete checking on as-builts
01/22/2010 GRADING - FINAL Denied Complete item #2 and submit final asbuilt/site plan for approval
01/13/2010 GRADING - FINAL Denied Complete the following prior to final approval;
Sht. 6
1) Install water harvest per note 4 or reivse plan.
2) Install curb opening with bollards per note 17
3) Install 4" reflective tape to bollards at curb openings per deatil.
4) Install 3 ft curb openings per note 9 or revise plan.
Sht 7
1) Extend scupper to end of sidewalk next to power transformer.
2) Add rip rap at outfall per detail Q/10
3) Install access ramps to rear basins per plan.
4) Install swale and riprap per plan & detail at east edge of project, or get engineering approval.
5) Check elevation at outfall scupper to basin detail AA/12.

Revise as-builts as necessary to reflect actual conditions in the field.
Remove all construction debris and temp. roll off.