Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T09BU00399
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | MET WITH SUPERINTENDENT ON SITE, DISCUSSED STORM WATER PLAN AND GRADING PLAN. CONTRACTOR IN PROCESS OF INSTALLING SEDIMENT CONTROLS | |
| 02/17/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | 1) PRIOR TO GRUBBING AND GRADING OF SITE, CONTRACTOR MUST IMPLEMENT THE APPROVED STORM WATER PLAN AND INSTALL PERIMETER STORM WATER CONTROLS PER PLAN. 2) CONTROLS SHALL INCLUDE SILT FENCE/SILT SOCK, STABILIZED CONSTRUCTION ENTRANCE, CONCRETE WASH OUT AREA AND PROPER STORAGE OF CONSTRUCTION WASTE ON SITE. CALL FOR INSPECTION WHEN CONTROLS HAVE BEEN INSTALLED |
|
| 02/17/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | CONTRACTOR IS WORKING ON THE INSTALLATION OF THE CONTROLLS, HE HAS CUT THE GRADER DITCHESS ALONG THE ADJACENT STREETS AND WILL BE INSTALLING THE WADDLE AS SOON AS AREA IS READY. HAVE REMINDED THE CONTRACTOR TO CONTACT THIS OFFICE ONCE THE STORMWATER CONTROLS ARE IN. |