Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 09/22/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 08/12/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. ENSURE YOUR SWPPP IS FOLLOWED THROUGHOUT THE PROJECT. | |
| 07/27/2009 | STORMWATER FOLLOW-UP INSP | Continued | 1) DURING MASS GRADING OF NW CORNER OF SITE - ADD SEDIMENT CONTROLS TO BASE OF HANDRAILING DURING CONSTRUCTION AND AT END OF DAY, INSTALL CONTROLS AT TOW OF SLOPE. 2) SWEEP PATHWAY AND PUBLIC ROADWAYS ROUTINELY. 3) ENSURE THERE IS A PHYSICAL BARRIER BETWEEN THE PUBLIC AND CONSTRUCTION ACTIVITIES AND/OR A SPOTTER FOR HEAVY EQUIPMENT WHEN WORKING ON OR NEAR THE WALKING PATHWAY. |