Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2009 | STORMWATER INSTALL OF CONTROLS | Approved | CONTRACTOR FAILED TO CALL IN FINAL INSPECTION. MET SAME CONTRACTOR ON JOB AT CAP PLANT AT TUCSON ESTATES PARKWAY AND WAS ASKED TO INSPECT SITE AND CLOSE OUT PERMIT. STORMWATER CONTROLS HAVE BEEN REMOVED, SITE FINISHED AND DISTRUBED AREAS STABILIZED. | |
| 04/22/2009 | STORMWATER INSTALL OF CONTROLS | Correction Required | MET WITH DAN WALKER ON SITE. 884-5900. SWPPP DONE BY DEREK WITH TRINITY GREEN 269-2996. PLEASE UPDATE SWPPP MAP WITH INSTALLATION/MAINT. DATES. ADDRESS FINAL STABILIZATION HYDROSEED OR ROCK. |