Inspection Status: Approved
Inspection History: LANDSCAPE INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 03/26/2012 |
LANDSCAPE INSPECTION |
|
Approved |
|
| 10/12/2011 |
LANDSCAPE INSPECTION |
|
Continued |
1) RESEEDING OF ALL AREAS THAT HAVE BEEN DISTRUBED DURING THE NEW CONSTRUCTION. THE EXISTING AREA OF PREVIOUSLY DISTURBED AREA WILL BE DISCUSSED WITH JOSEPH LINVILLE TO DETERMINE WHAT IS NEEDED IN THESE LOCATIONS. 2) ENSURE THAT ALL PLANTS HAVE BEEN COMPLETED AND PROVIDE AS-BUILT DRAWINGS, PLUS A STAMPED CERTIFICATION LETTER FROM THE ENGINEER OF RECORD STATING THAT ALL HAS BEEN COMPLETED AS SHOWN ON THE APPROVED SET OF PLANS AND AS-BUILT DRAWINGS. 4) A MONITORING REPORT FROM THE LANDSCAPE ARCHITECT NOTING WHERE ALL OF THE REQUIRED PLANTS FOR THE NPPO PLANS HAVE BEEN PLACED, OR WHAT HAS BEEN REPLACED DUE TO PREVIOUS DAMAGE OR DETERIORATION. |
| 07/25/2011 |
LANDSCAPE INSPECTION |
|
Continued |
NOTHING HAPPENING AT THIS TIME, THE CONTRACTOR IS AWARE OF ALL THE PLANTS THAT NEED TO BE PLACED EITHER THROUGH NEW PLANT ESTABLISHMENT OR FROM THE EXISTING MATERIALS THAT ARE ON THIS SITE AT THIS TIME. |