Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2009 | STORMWATER INSTALL OF CONTROLS | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED. CONTRACTOR WILL INSTALL A DESIGNATED CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE. CONTRACTOR MUST MAINTAIN SED CONTROLS THROUGHOUT THE DURATION OF THE PROJECT. CONTINUE TO SWEEP UP TRACKING AS NEEDED. |