Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/15/2009 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
|
| 07/23/2009 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
MET WITH THE DEVELOPER ON-SITE TO DISCUSS THE FUTURE PROJECT THAT WILL START IN THE NEXT 2 WEEKS. I HAVE ASKED THAT THEY NOTIFY US ONCE THEY ARE READY TO BEGIN THE ON-SITE WORK AND THAT THEY TRY TO GIVE US A SCHEDULE FOR THEM COMPLETING THEIR WORK.STORM WATER CONTROL FOR THIS SITE WILL BE LIMITED TO THE AREAS WHERE OPEN CONSTRUCTION WORK IS HAPPENING. THIS SITE WAS COMPLETED A FEW YEARS AGO AND IS NOW HAVING TO BE REMODIFIED TO MEET OUR CURRENT STANDARDS SINCE A PERMIT WAS NOT ORIGINALLY PULLED. |